PROFIBUS bus instrumentation and PLC communication settings - Database & Sql Blog Articles

SMD Aluminum Electrolytic Capacitor
Brand AVX TPSE226M035R0125 Low Impedance Tantalum Capacitor, AVX 22
Electronic Scale Crystal Oscillator 3.2x2.5mm 3225 16M (16.000MHZ) 12PF 10PPM 20PPM 30PPM
Domestic Probe PA100-H2, Diameter 1.36mm, Thimble Length 33.35mm, Current
Huaqiang Square Crystal Original Spot Stock

Profibus DP Bus Meter - PLC - Host Computer. How to Set Up an Automatic Control System?

Answer: To set up a control system using a Profibus DP bus meter connected to a PLC and a host computer, you need the following hardware configuration:

First, the PLC must have a Profibus DP interface. In the STEP7 software, it's essential to install the GSD file of the bus device and configure it correctly. This ensures that the PLC can communicate with the DP slave devices.

For third-party DP slaves, the general setup process involves the following steps:

  1. Use the HW Config tool in STEP7 to add the device by installing its GSD file.
  2. Configure the device within the S7-300 master system.
  3. Program the PLC to read and write data from the corresponding I/O addresses.
  4. If the data is not binary, refer to the slave device’s manual for specific instructions on how to interpret and handle the data.

It's also recommended to consult Siemens experts or technical support for more detailed guidance, especially when dealing with non-standard or custom devices. Proper configuration and testing are crucial to ensure smooth communication and reliable operation of the entire system.

FAKRA Automotive High Frequency Cable Assembly

Fakra Automotive High Frequency Cable Assembly,High Frequency Cable,High Frequency Cable Connectors,Automotive Board Connector

Dongguan Zhuoyuexin Automotive Electronics Co.,Ltd , https://www.zyx-fakra.com

This entry was posted in on