Guoneng Green Energy Co., Ltd. Hongyang Clean Fuel Production Site Reclaimer Equipment Tender Notice

Guoneng Green Energy Co., Ltd. Hongyang Clean Fuel Production Site Reclaimer Equipment Tender Notice

The tender number: GNZB-2016-001

Tender code: CBL_20160927_27809109

Opening time:

Bulletin category: Domestic tender

Source of funding: other

Tenderee: Guoneng Green Energy Co., Ltd.

Equipment tender notice

Project Name: Guoneng Green Energy Co., Ltd. Hongyang Clean Fuel Production Site Reclaimer Equipment Tender

The tender number: GNZB-2016-001

Tenderee: Guoneng Green Energy Co., Ltd.

1. Guoneng Green Energy Co., Ltd. Hongyang clean fuel production site reclaimer equipment for domestic open tender.

2. List of cargo requirements

Uses for raw coal long pre-homogeneous storage yard

Arrangement style covered factory building, interior layout, a bunch of a take

Shelf size 33mx161m

Reclaimer picking form: Bridge scraper

Reclaim material: raw coal

Recycling capacity: 200t/h (0.85~1.0t/m3)

Track gauge: 26 m Track length: ~160m

Quantity: 1

Supply scope equipment body and electronic control system

Delivery time before November 25, 2016

Technical Requirements 1) The control of the reclaimer control box should be controlled by a small PLC (programmable controller) to ensure the reliable operation of the equipment.

2) All kinds of power distribution, control and protection of the electrical equipment for the reclaimer should be completed in the control box, including the necessary primary and secondary circuits.

3) In the control box incoming line, distribution and control loops require the use of air switches.

4) In order to reduce the type and quantity of spare parts and reduce the production and maintenance workload of the factory, the main distribution and control component selection requirements of the control box are consistent with the project design.

Purchasing requirements According to the scope of equipment procurement and supply, the manufacturer's technical drawings and materials must meet the requirements of the engineering construction drawing design. The capital contribution includes at least but not limited to the following:

(1) Provide equipment specifications and main performance parameters (including track models).

(2) Provide equipment accessories and drive configuration and technical description.

(3) To provide general equipment drawings, load and layout drawings, and stacker-reclaimer operation contours.

(4) Electrical automatic control requirements and technical specifications. The manufacturer shall provide the complete set of schematic diagrams for electrical control, external wiring diagrams, material tables, dimensional drawings, component layouts, wiring diagrams, etc.

Supply scope and spare parts description: The scope of equipment supply is to meet all the technical parameters of the parts and electronic control equipment to ensure that the equipment can be long-term, safe and normal operation, and to achieve the following required technical parameters of the equipment, Random accessories, special maintenance tools, spare parts (spare parts during the warranty period). The seller shall provide a complete set of equipment, including installation tools, connections between systems, and spare parts (free replacement during the warranty period), etc. The detailed scope shall be based on the general equipment drawings and sub-total drawings confirmed by the buyer. The seller must take full responsibility for the integrity of the equipment and the ability to meet the technical requirements of the equipment. Ancillary equipment devices that operate stably and effectively for the system are within the scope of supply.

List of spare parts and special tools (included in the total price, including but not limited to the following)

(The tenderer may give a list of random spare parts and ask the bidder for a quotation; it may also ask the bidder to fill in the form himself)

No. Name Quantity Remarks

1

2

3. Qualification requirements of bidders:

(1) Has an independent legal person status;

(2) Has a production license issued by the relevant department;

(3) Passed the ISO9000 series quality system certification and had nearly 3 years of production of similar equipment;

(4) Other information such as qualifications, capabilities, reputation, and financial status of bidders.

4. Guoneng Green Energy Co., Ltd. will accept bidders' bids and qualifications for qualified bids from September 12, 2016 to September 24, 2016 (except public holidays, 8:00 am to 6:00 pm, Beijing time) People sell tender documents, bids priced at 3,000 yuan, the tender documents are not refundable. Composition of Bidding Documents: The six parts listed in this tender document. Number of tenders: One original copy, four copies, and one electronic copy. Tender answer: Do not focus on answering questions, before the opening of the bid can be e-mail and answer questions.

5. Other evaluation factors:

Content: delivery time, after-sales service, performance, accident risk, etc.

Location of the contract: Shenyang

6. When registering and purchasing tender documents, the bidder must provide the following information:

(1) The original copy of the business license and a copy of the official seal;

(2) A copy of the qualification certificate stamped with the official seal;

(3) The original letter of authorization of the legal representative and the original ID card of the authorized person and a copy of the official seal (original and photocopy);

7. The deadline for the receipt of bid documents and the time for opening bids are before 9:00 on September 25, 2016 and 9:30 on September 25, 2016. The bid shall be submitted in the form of RMB to quote the bid price, and the contract shall also be paid in RMB. Explanation: Business bids and technical bids must be separately bound. Business proposals must be sealed.

8. Bid Opening Place: To Be Determined

9. Bid security: no bid security is charged.

10. Bid validity period: 90 days after bid opening

11. Reasons that may lead to scrapped bids:

No substantive response to the request for proposals;

Bidders do not accept corrected prices due to calculation errors;

There are indeed technical deviations, but the technical deviation table has not been accurately filled out;

The content of the bid is different from the actual situation.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.